ITAC Assessment: NV0131
ITAC logo
ITAC Assessment: NV0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Asphalt Paving Mixtures, Concrete Ready-Mix
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 100,000
ton
Production Hrs. Annual 4,368
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,667 1,114,889
kWh
Electricity Demand $59,932 9,460
kW-mo/yr
Electricity Fees $4,270 -
Natural Gas $28,159 4,515
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,159

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $105 $200 - - - $105
-
MMBtu
-
02 2.3212: Optimize plant power factor $1,146 $1,933 - - $1,146 - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,277 $638 $836
19,050
kWh
$441
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $111 $80 $72
1,758
kWh
$39
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $327 - $213
4,982
kWh
$114
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $444 $50 $289
6,741
kWh
$155
-
kW-mo/yr
- - -
07 4.444: Install system to collect scrap $24,024 $20,320 - - - - $24,024
TOTAL RECOMMENDED $27,434 $23,221 $1,410
32,531
kWh
$749
-
kW-mo/yr
$1,146 $105
-
MMBtu
$24,024
TOTAL IMPLEMENTED $2,159 $768 $1,410
32,531
kWh
$749
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs