ITAC Assessment: NV0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Bottled Soft Drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 81,200
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,214 813,306
kWh
Electricity Demand $32,560 3,439
kW-mo/yr
Electricity Fees $3,177 -
Natural Gas $21,417 4,120
MMBtu
Fuel Oil #2 $6,832 1,019
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,107 $12,275 $9,166
106,096
kWh
- - - $(-1,059.0)
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $202 $64 $137
3,224
kWh
$61
-
kW-mo/yr
$4 - -
03 2.7231: Use radiant heater for spot heating $1,842 $3,350 - - - $(-3,282.0)
-
MMBtu
$5,124
-
MMBtu
04 2.8114: Change rate schedules or other changes in utility service $3,198 - - - $3,198 - -
TOTAL RECOMMENDED $13,349 $15,689 $9,303
109,320
kWh
$61
-
kW-mo/yr
$3,202 $(-3,282.0)
-
MMBtu
$4,065
-
MMBtu
TOTAL IMPLEMENTED $11,305 $12,275 $9,166
106,096
kWh
- $3,198 - $(-1,059.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs