ITAC Assessment: NV0113
ITAC logo
ITAC Assessment: NV0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Vinyl Sheeting
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 66,000
ft2
Annual Production 18,990,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $272,289 6,609,613
kWh
Electricity Demand $120,130 12,524
kW-mo/yr
Electricity Fees $2,384 -
Natural Gas $198,394 34,737
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $308,678 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $299,524

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.1213: Direct warmest air to combustion intake $2,386 $333 - - - $2,386
-
MMBtu
- - -
02 2.2511: Insulate bare equipment $845 $546 - - - $845
-
MMBtu
- - -
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $278,123 $520,000 - - - - $278,123 - -
04 2.7124: Make a practice of turning off lights when not needed $390 - $332
8,206
kWh
$64
-
kW-mo/yr
$(-6.0) - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,185 $10,360 $2,868
65,064
kWh
$356
-
kW-mo/yr
$(-39.0) - - - -
06 2.7145: Install skylights $643 $2,443 $395
9,672
kWh
$235
-
kW-mo/yr
$13 - - - -
07 2.8113: Purchase gas directly from a contract gas supplier $21,011 - - - - - - - $21,011
08 2.9112: Use solar heat to heat water $2,095 - - - - $10,475
-
MMBtu
- $(-8,380.0) -
TOTAL RECOMMENDED $308,678 $533,682 $3,595
82,942
kWh
$655
-
kW-mo/yr
$(-32.0) $13,706
-
MMBtu
$278,123 $(-8,380.0) $21,011
TOTAL IMPLEMENTED $299,524 $520,000 $332
8,206
kWh
$64
-
kW-mo/yr
$(-6.0) - $278,123 - $21,011
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs