Assessment Year | 1998 |
---|---|
Principal Product | Plastic Products |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 98 |
Plant Area |
43,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $92,621 | 2,219,519 |
kWh
|
$0.042 |
Electricity Demand | $44,720 | 4,819 |
kW-mo/yr
|
$9.28 |
Electricity Fees | $3,359 | - |
|
- |
Natural Gas | $1,006 | 160 |
MMBtu
|
$6.29 |
LPG | $3,416 | 181 |
MMBtu
|
$18.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $662,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,560 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $544 | $2,000 |
$408
9,672
kWh
|
$125
-
kW-mo/yr
|
$11 | - | - | - | |
02 | 2.2511: Insulate bare equipment | $282 | $736 |
$171
4,103
kWh
|
$105
-
kW-mo/yr
|
$6 | - | - | - | |
03 | 4.424: Improve space comfort conditioning | $16,667 | $9,361 | - | - | - | - | - | $16,667 | |
04 | 4.111: Add equipment/ operators to reduce production bottleneck | $87,965 | $255 | - | - | - | - | - | $87,965 | |
05 | 4.323: Optimize lot sizes to reduce inventory carrying costs | $550,755 | $48,000 | - | - | - | - | - | $550,755 | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,277 | $230 | - | - | - |
$1,277
-
Tgal
|
- | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,560 | - | - | - | - | - |
$4,560
-
lb
|
- | |
TOTAL RECOMMENDED | $662,050 | $60,582 |
$579
13,775
kWh
|
$230
-
kW-mo/yr
|
$17 |
$1,277
-
Tgal
|
$4,560
-
lb
|
$655,387 | ||
TOTAL IMPLEMENTED | $4,560 | - | - | - | - | - |
$4,560
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs