ITAC Assessment: AS0210
ITAC logo
ITAC Assessment: AS0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Oak Office Furniture
NAICS
n/a
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 69,000
ft2
Annual Production 76,500
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,863 1,211,899
kWh
Electricity Demand $8,411 4,933
kW-mo/yr
Electricity Fees $8,633 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,771 $2,051 n/a $1,477
18,757
kWh
$294
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $562 $1,050 n/a $485
6,155
kWh
$77
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,457 $90 n/a $1,156
14,654
kWh
$301
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,284 $620 n/a $3,589
45,721
kWh
$695
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $4,173 $4,099 n/a $3,496
44,549
kWh
$677
-
kW-mo/yr
- - -
06 2.6212: Turn off equipment during breaks, reduce operating time $1,327 $60 n/a $1,327
16,999
kWh
- - - -
07 3.5313: Increase amount of waste recovered for resale $9,113 $30 n/a - - $9,113
-
lb
- -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,080 $30 n/a - - $1,080
-
lb
- -
09 4.611: Begin a practice of predictive / preventative maintenance $942 $135 n/a $(-173.0)
2,345
kWh
$(-3.0)
-
kW-mo/yr
- $1,296 $(-178.0)
-
Tgal
10 2.8123: Pay utility bills on time $934 - n/a - - - $934 -
TOTAL RECOMMENDED $25,643 $8,165 $11,357
149,180
kWh
$2,041
-
kW-mo/yr
$10,193
-
lb
$2,230 $(-178.0)
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs