Assessment Year | 1997 |
---|---|
Principal Product | Oak Office Furniture |
NAICS |
n/a
|
SIC | 2521: Wood Office Furniture |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
69,000
ft2
|
Annual Production | 76,500
pieces
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $109,863 | 1,211,899 |
kWh
|
$0.091 |
Electricity Demand | $8,411 | 4,933 |
kW-mo/yr
|
$1.71 |
Electricity Fees | $8,633 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,643 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,771 | $2,051 | n/a |
$1,477
18,757
kWh
|
$294
-
kW-mo/yr
|
- | - | - |
02 | 2.7135: Install occupancy sensors | $562 | $1,050 | n/a |
$485
6,155
kWh
|
$77
-
kW-mo/yr
|
- | - | - |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,457 | $90 | n/a |
$1,156
14,654
kWh
|
$301
-
kW-mo/yr
|
- | - | - |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,284 | $620 | n/a |
$3,589
45,721
kWh
|
$695
-
kW-mo/yr
|
- | - | - |
05 | 2.4133: Use most efficient type of electric motors | $4,173 | $4,099 | n/a |
$3,496
44,549
kWh
|
$677
-
kW-mo/yr
|
- | - | - |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,327 | $60 | n/a |
$1,327
16,999
kWh
|
- | - | - | - |
07 | 3.5313: Increase amount of waste recovered for resale | $9,113 | $30 | n/a | - | - |
$9,113
-
lb
|
- | - |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,080 | $30 | n/a | - | - |
$1,080
-
lb
|
- | - |
09 | 4.611: Begin a practice of predictive / preventative maintenance | $942 | $135 | n/a |
$(-173.0)
2,345
kWh
|
$(-3.0)
-
kW-mo/yr
|
- | $1,296 |
$(-178.0)
-
Tgal
|
10 | 2.8123: Pay utility bills on time | $934 | - | n/a | - | - | - | $934 | - |
TOTAL RECOMMENDED | $25,643 | $8,165 |
$11,357
149,180
kWh
|
$2,041
-
kW-mo/yr
|
$10,193
-
lb
|
$2,230 |
$(-178.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs