ITAC Assessment: NV0102
ITAC logo
ITAC Assessment: NV0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Pipe, Concrete
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 18,400
ft2
Annual Production 38,000
ton
Production Hrs. Annual 2,730
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,914 338,804
kWh
Electricity Demand $10,568 2,118
kW-mo/yr
Electricity Fees $2,422 -
Natural Gas $13,362 2,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
01 2.7134: Use photocell controls $1,515 $340 $936
18,757
kWh
$549
-
kW-mo/yr
$30 - - - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $995 $950 $639
12,896
kWh
$336
-
kW-mo/yr
$20 - - - - -
03 2.4314: Use synthetic lubricant $3,450 $800 $2,214
44,549
kWh
$1,168
-
kW-mo/yr
$68 - - - - -
04 2.8113: Purchase gas directly from a contract gas supplier $1,336 $750 - - - - - $1,336 - -
05 4.112: Replace old machine with new automatic multi-station tool $99,943 $575,000 - - - $3,608
-
MMBtu
- - - $96,335
06 4.112: Replace old machine with new automatic multi-station tool $28,225 $116,750 - - - - $4,212
-
lb
- $24,013 -
TOTAL RECOMMENDED $135,464 $694,590 $3,789
76,202
kWh
$2,053
-
kW-mo/yr
$118 $3,608
-
MMBtu
$4,212
-
lb
$1,336 $24,013 $96,335
TOTAL IMPLEMENTED $29,220 $117,700 $639
12,896
kWh
$336
-
kW-mo/yr
$20 - $4,212
-
lb
- $24,013 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs