Assessment Year 1997
Principal Product Western Jewelry
NAICS
n/a
SIC 3961: Costume Jewelry and Costume Novelties, Except Precious Metal
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 15,000
ft2
Annual Production 195,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,079 916,471
kWh
Electricity Demand $31,301 3,373
kW-mo/yr
Electricity Fees $339 -
Natural Gas $24,854 4,787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,055 $232 $487
11,137
kWh
$568
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $761 $125 $351
7,913
kWh
$410
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $135 $163 $71
1,758
kWh
$64
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $122 $200 $122
2,931
kWh
- - -
05 2.4133: Use most efficient type of electric motors $340 $592 $274
6,155
kWh
$66
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $1,179 $1,154 $1,179
14,947
kWh
- - -
07 2.2514: Cover open tanks $897 $375 $444
10,258
kWh
$453
-
kW-mo/yr
- -
08 4.425: Eliminate/reduce redundant inspections $66,700 $25,000 - - $66,700 -
09 4.821: Pay bills on time to avoid late fees $1,030 - - - - $1,030
TOTAL RECOMMENDED $72,219 $27,841 $2,928
55,099
kWh
$1,561
-
kW-mo/yr
$66,700 $1,030
TOTAL IMPLEMENTED $2,198 $1,729 $1,745
28,136
kWh
$453
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs