ITAC Assessment: MS0313
ITAC logo
ITAC Assessment: MS0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Radiators
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 138,000
ft2
Annual Production 325,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $278,226 6,150,000
kWh
Electricity Demand $39,029 12,789
kW-mo/yr
Electricity Fees $24,873 -
Natural Gas $250,741 24,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,342 $27,930 $18,349
448,243
kWh
$2,548
-
kW-mo/yr
$1,445 - -
02 3.5315: Lease / purchase baler; sell cardboard to recycler $20,700 $6,500 - - - - $20,700
03 2.2515: Use optimum thickness insulation $7,075 $2,156 - - - $7,075
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,010 $11,969 $2,474
60,431
kWh
$342
-
kW-mo/yr
$194 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,195 $231 $1,045
47,669
kWh
- $150 - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,321 $5,175 $1,045
25,563
kWh
$194
-
kW-mo/yr
$82 - -
TOTAL RECOMMENDED $55,643 $53,961 $22,913
581,906
kWh
$3,084
-
kW-mo/yr
$1,871 $7,075
-
MMBtu
$20,700
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs