ITAC Assessment: NV0079
ITAC logo
ITAC Assessment: NV0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Pressure treated wood products
NAICS
n/a
SIC 2491: Wood Preserving
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 350,000
ft2
Annual Production 1,500,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,012 623,388
kWh
Electricity Demand $15,516 1,687
kW-mo/yr
Electricity Fees $1,349 -
Natural Gas $88,638 16,938
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,508 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,533

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $8,890 $9,124 - - $8,890
-
MMBtu
- -
02 2.2511: Insulate bare equipment $13,870 $7,320 - - $13,870
-
MMBtu
- -
03 2.2135: Repair and eliminate steam leaks $1,071 $250 - - $1,071
-
MMBtu
- -
04 2.2511: Insulate bare equipment $325 $409 - - $325
-
MMBtu
- -
05 2.7135: Install occupancy sensors $896 $196 $737
15,826
kWh
$159
-
kW-mo/yr
- - -
06 2.2437: Recover waste heat from equipment $3,129 $3,350 - - $3,129
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $137 $10 $137
2,931
kWh
- - - -
08 3.3128: Utilize other methods to remove contaminants $840 $408 - - - $840
-
lb
-
09 4.821: Pay bills on time to avoid late fees $2,350 - - - - - $2,350
TOTAL RECOMMENDED $31,508 $21,067 $874
18,757
kWh
$159
-
kW-mo/yr
$27,285
-
MMBtu
$840
-
lb
$2,350
TOTAL IMPLEMENTED $1,533 $669 $137
2,931
kWh
- $1,396
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs