Assessment Year | 1997 |
---|---|
Principal Product | Steel Reloading Dies |
NAICS |
n/a
|
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
105,000
ft2
|
Annual Production | 700,000
pieces
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $211,862 | 2,487,104 |
kWh
|
$0.085 |
Electricity Demand | $33,666 | 7,904 |
kW-mo/yr
|
$4.26 |
Electricity Fees | $12,678 | - |
|
- |
Natural Gas | $34,095 | 6,393 |
MMBtu
|
$5.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,465 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,295 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $134 | $37 |
$117
10,844
kWh
|
$17
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,161 | $300 |
$1,161
13,775
kWh
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $729 | $327 |
$649
7,620
kWh
|
$80
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,956 | $1,911 |
$8,581
100,821
kWh
|
$1,375
-
kW-mo/yr
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $5,980 | $800 |
$5,180
60,961
kWh
|
$800
-
kW-mo/yr
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $7,229 | $4,000 | - | - |
$7,229
-
MMBtu
|
- | |
07 | 3.8141: Regenerate cleaning solvent on-site and reuse | $30,371 | $47,825 | - | - | - |
$30,371
-
gal
|
|
08 | 3.4155: Meter waste water | $1,905 | $4,000 | - | - | - |
$1,905
-
gal
|
|
TOTAL RECOMMENDED | $57,465 | $59,200 |
$15,688
194,021
kWh
|
$2,272
-
kW-mo/yr
|
$7,229
-
MMBtu
|
$32,276
-
gal
|
||
TOTAL IMPLEMENTED | $1,295 | $337 |
$1,278
24,619
kWh
|
$17
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs