ITAC Assessment: NV0070
ITAC logo
ITAC Assessment: NV0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Rotary Cutting Tools
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 42,500
ft2
Annual Production 325,000
lb
Production Hrs. Annual 5,460
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,659 1,044,256
kWh
Electricity Demand $13,918 3,005
kW-mo/yr
Electricity Fees $1,255 -
Natural Gas $993 149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $6,386 $20 $5,829
66,530
kWh
$557
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $743 $200 $743
8,499
kWh
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $413 - $374
4,396
kWh
$39
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $968 $282 $868
9,965
kWh
$100
-
kW-mo/yr
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,846 $920 - - - - $1,846
06 2.4323: Use optimum size and capacity equipment $3,238 $180 - - $3,238 - -
07 3.7393: Implement a machine and coolant sump cleaning program to minimize coolant contamination $5,400 $10,000 - - - $5,400
-
gal
-
TOTAL RECOMMENDED $18,994 $11,602 $7,814
89,390
kWh
$696
-
kW-mo/yr
$3,238 $5,400
-
gal
$1,846
TOTAL IMPLEMENTED $13,594 $1,602 $7,814
89,390
kWh
$696
-
kW-mo/yr
$3,238 - $1,846
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs