ITAC Assessment: NV0064
ITAC logo
ITAC Assessment: NV0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Custom Elecronic Fittings
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 60,000
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 7,826
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,151 1,338,804
kWh
Electricity Demand $35,875 3,844
kW-mo/yr
Electricity Fees $1,800 -
Natural Gas $4,376 865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,128

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $382 $758 $260
5,862
kWh
$122
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $2,281 $268 $1,542
29,601
kWh
$739
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $552 $491 $552
10,551
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $194 $230 $194
4,396
kWh
- -
05 2.2437: Recover waste heat from equipment $555 $790 $555
12,309
kWh
- -
06 4.321: Optimize production lot sizes and inventories $48,000 $189,800 - - $48,000
TOTAL RECOMMENDED $51,964 $192,337 $3,103
62,719
kWh
$861
-
kW-mo/yr
$48,000
TOTAL IMPLEMENTED $49,128 $191,279 $1,006
20,809
kWh
$122
-
kW-mo/yr
$48,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs