ITAC Assessment: NV0055
ITAC logo
ITAC Assessment: NV0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Floral foam
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range n/a
# of Employees 30
Plant Area 53,000
ft2
Annual Production 500,000,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,902 550,996
kWh
Electricity Demand $31,607 3,406
kW-mo/yr
Electricity Fees $600 -
Natural Gas $21,203 3,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $86 $63 $31
586
kWh
$55
-
kW-mo/yr
- -
02 2.3137: Use power during off-peak periods $3,340 - - $3,340
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $2,239 $200 $1,304
30,188
kWh
$935
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $1,970 $1,600 - - $1,970
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $480 - $480
11,137
kWh
- - -
06 2.4239: Eliminate or reduce compressed air usage $3,395 $4,000 - - $3,395
-
MMBtu
-
07 3.6192: Use a less expensive method of waste removal $4,080 $8,170 - - - $4,080
-
lb
TOTAL RECOMMENDED $15,590 $14,033 $1,815
41,911
kWh
$4,330
-
kW-mo/yr
$5,365
-
MMBtu
$4,080
-
lb
TOTAL IMPLEMENTED $2,239 $200 $1,304
30,188
kWh
$935
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs