ITAC Assessment: NV0054
ITAC logo
ITAC Assessment: NV0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Liquified Gas Pumps
NAICS
n/a
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 30,000
ft2
Annual Production 175
pieces
Production Hrs. Annual 2,527
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,459 591,149
kWh
Electricity Demand $53,831 6,857
kW-mo/yr
Electricity Fees $5,780 -
Natural Gas $11,928 2,279
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,604

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $879 $2,000 $284
6,448
kWh
$566
-
kW-mo/yr
$29 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $65 $18 $65
1,465
kWh
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $1,095 $30 $566
13,189
kWh
$471
-
kW-mo/yr
$58 - -
04 2.7135: Install occupancy sensors $570 $144 $258
5,862
kWh
$283
-
kW-mo/yr
$29 - -
05 2.3212: Optimize plant power factor $245 $600 - - $245 - -
06 2.2511: Insulate bare equipment $9,750 $268 - - - $9,750
-
Tgal
-
07 3.6125: Sell combustible waste $2,700 $5,000 - - - - $2,700
-
lb
TOTAL RECOMMENDED $15,304 $8,060 $1,173
26,964
kWh
$1,320
-
kW-mo/yr
$361 $9,750
-
Tgal
$2,700
-
lb
TOTAL IMPLEMENTED $12,604 $3,060 $1,173
26,964
kWh
$1,320
-
kW-mo/yr
$361 $9,750
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings