ITAC Assessment: NV0050
ITAC logo
ITAC Assessment: NV0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product wood furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 96
Plant Area 50,000
ft2
Annual Production 52,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,013 725,674
kWh
Electricity Demand $23,706 2,985
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,885

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $57,460 $140,000 $7,000
113,716
kWh
$2,300
-
kW-mo/yr
- $48,160
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,043 $300 $1,043
19,050
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,040 $2,200 $2,040
32,825
kWh
- - -
04 2.4133: Use most efficient type of electric motors $842 $521 $599
9,672
kWh
$243
-
kW-mo/yr
- -
05 3.6125: Sell combustible waste $2,500 $520 - - $2,500
-
lb
-
TOTAL RECOMMENDED $63,885 $143,541 $10,682
175,263
kWh
$2,543
-
kW-mo/yr
$2,500
-
lb
$48,160
TOTAL IMPLEMENTED $63,885 $143,541 $10,682
175,263
kWh
$2,543
-
kW-mo/yr
$2,500
-
lb
$48,160
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs