ITAC Assessment: NV0035
ITAC logo
ITAC Assessment: NV0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Commercial Cooking Equipment
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 111,000
ft2
Annual Production 2,600,000
lb
Production Hrs. Annual 4,930
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,452 2,398,007
kWh
Natural Gas $23,003 3,711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,311

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,168 $7,072 $2,168
26,377
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,143 $300 $1,143
24,619
kWh
-
03 2.2437: Recover waste heat from equipment $3,817 $1,400 - $3,817
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $761 $511 $761
8,792
kWh
-
05 2.3212: Optimize plant power factor $1,667 $4,058 $1,667
-
kWh
-
TOTAL RECOMMENDED $9,556 $13,341 $5,739
59,788
kWh
$3,817
-
MMBtu
TOTAL IMPLEMENTED $3,311 $7,372 $3,311
50,996
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs