Assessment Year | 1995 |
---|---|
Principal Product | Automitive Camshaft Bearings |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
58,000
ft2
|
Annual Production | 14,000,000
pieces
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,241 | 1,558,324 |
kWh
|
$0.074 |
Natural Gas | $102,594 | 17,450 |
MMBtu
|
$5.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,385 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $963 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,268 | $3,296 |
$3,268
36,049
kWh
|
- | |
02 | 2.7144: Install spectral reflectors / delamp | $2,584 | $100 |
$2,584
7,913
kWh
|
- | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $2,433 | $6,500 | - |
$2,433
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $833 | - |
$833
11,430
kWh
|
- | |
05 | 2.7224: Reduce space conditioning during non-working hours | $963 | - | - |
$963
-
MMBtu
|
|
06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $564 | $114 | - |
$564
-
MMBtu
|
|
07 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $6,740 | $11,490 | - |
$6,740
-
MMBtu
|
|
TOTAL RECOMMENDED | $17,385 | $21,500 |
$6,685
55,392
kWh
|
$10,700
-
MMBtu
|
||
TOTAL IMPLEMENTED | $963 | - | - |
$963
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs