ITAC Assessment: NV0019
ITAC logo
ITAC Assessment: NV0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel Investment Castings
NAICS
n/a
SIC 3324: Steel Investment Foundries
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 42,000
ft2
Annual Production 800,000
lb
Production Hrs. Annual 5,434
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,194 3,114,596
kWh
Natural Gas $91,964 15,579
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,981 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,159

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,580 - $4,580
58,030
kWh
-
02 2.2511: Insulate bare equipment $16,865 $5,181 - $16,865
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,385 $300 $2,385
30,188
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,957 $1,000 - $2,957
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,194 $2,220 $5,194
65,651
kWh
-
TOTAL RECOMMENDED $31,981 $8,701 $12,159
153,869
kWh
$19,822
-
MMBtu
TOTAL IMPLEMENTED $12,159 $2,520 $12,159
153,869
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs