ITAC Assessment: NV0006
ITAC logo
ITAC Assessment: NV0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Laser Equipment
NAICS
n/a
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 105,000
ft2
Annual Production 21,500
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $384,791 5,498,242
kWh
Natural Gas $27,614 4,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,657

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,709 $(-175.0) $3,709
53,341
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $2,218 $3,780 - $2,218
-
MMBtu
03 2.7135: Install occupancy sensors $914 $454 $914
12,016
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $554 $240 $554
7,913
kWh
-
05 2.3212: Optimize plant power factor $807 $2,250 $807
-
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $394 $30 $394
5,569
kWh
-
TOTAL RECOMMENDED $8,596 $6,579 $6,378
78,839
kWh
$2,218
-
MMBtu
TOTAL IMPLEMENTED $4,657 $95 $4,657
66,823
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs