| Assessment Year | 2026 |
|---|---|
| Principal Product | Windows and doors frames |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
70,000
ft2
|
| Annual Production | 12,000,000
lb
|
| Production Hrs. Annual | 8,424
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $270,924 | 4,635,934 |
kWh
|
$0.058 | |
| Electricity Demand | $120,683 | 9,367 |
kW-mo/yr
|
$12.88 | |
| Electricity Fees | $3,384 | - |
|
- | |
| Waste Disposal Costs | |||||
| Water Usage | $44,245 | 7,278 |
Tgal
|
$6.08 | |
| TOTAL YEARLY COSTS | $439,235 | ||||
| RECOMMENDED SAVINGS* | $83,445 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $41,635 | $5,000 | - | - | $41,635 | |
| 02 | 2.3212: Optimize plant power factor | $18,726 | $25,437 | - |
$18,726
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,473 | $5,753 |
$9,491
162,523
kWh
|
$2,982
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,767 | - |
$5,149
88,175
kWh
|
$1,618
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,252 | $2,157 |
$1,714
29,349
kWh
|
$538
-
kW-mo/yr
|
- | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,592 | - |
$1,592
27,254
kWh
|
- | - | |
| TOTAL RECOMMENDED | $83,445 | $38,347 |
$17,946
307,301
kWh
|
$23,864
-
kW-mo/yr
|
$41,635 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs