Assessment Year | 2025 |
---|---|
Principal Product | HVAC and Air Movement Systems |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
105,000
ft2
|
Annual Production | 2,668,000
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $144,515 | 2,282,624 |
kWh
|
$0.063 | |
Electricity Demand | $76,559 | 7,236 |
kW-mo/yr
|
$10.58 | |
Electricity Fees | $25,602 | - |
|
- | |
Natural Gas | $9,237 | 676 |
MMBtu
|
$13.66 | |
Waste Disposal Costs | |||||
Water Usage | $11,586 | 414 |
Tgal
|
$28.00 | |
TOTAL YEARLY COSTS | $267,500 | ||||
RECOMMENDED SAVINGS* | $142,211 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,061 | $5,609 |
$11,741
187,857
kWh
|
$5,320
-
kW-mo/yr
|
- | - | |
02 | 2.2511: Insulate bare equipment | $7,764 | $7,308 |
$7,764
124,231
kWh
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,840 | - |
$3,331
53,296
kWh
|
$1,509
-
kW-mo/yr
|
- | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $79,073 | $292,302 |
$5,163
82,604
kWh
|
- | - | $73,910 | |
05 | 2.3212: Optimize plant power factor | $14,101 | $17,176 | - | - | $14,101 | - | |
06 | 2.8121: Apply for tax-free status for energy purchases | $19,372 | $5,000 | - | - | - | $19,372 | |
TOTAL RECOMMENDED | $142,211 | $327,395 |
$28,000
447,989
kWh
|
$6,829
-
kW-mo/yr
|
$14,101 | $93,282 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs