ITAC Assessment: NT0049
ITAC logo
ITAC Assessment: NT0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product HVAC and Air Movement Systems
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 105,000
ft2
Annual Production 2,668,000
units
Production Hrs. Annual 4,420
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,515 2,282,624
kWh
Electricity Demand $76,559 7,236
kW-mo/yr
Electricity Fees $25,602 -
Natural Gas $9,237 676
MMBtu
Waste Disposal Costs
Water Usage $11,586 414
Tgal
TOTAL YEARLY COSTS $267,500
RECOMMENDED SAVINGS* $142,211 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,061 $5,609 $11,741
187,857
kWh
$5,320
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $7,764 $7,308 $7,764
124,231
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,840 - $3,331
53,296
kWh
$1,509
-
kW-mo/yr
- -
04 2.7232: Replace existing hvac unit with high efficiency model $79,073 $292,302 $5,163
82,604
kWh
- - $73,910
05 2.3212: Optimize plant power factor $14,101 $17,176 - - $14,101 -
06 2.8121: Apply for tax-free status for energy purchases $19,372 $5,000 - - - $19,372
TOTAL RECOMMENDED $142,211 $327,395 $28,000
447,989
kWh
$6,829
-
kW-mo/yr
$14,101 $93,282
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs