Assessment Year | 2025 |
---|---|
Principal Product | Machined Custom Parts |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 103 |
Plant Area |
100,000
ft2
|
Annual Production | 424,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $276,549 | 3,626,000 |
kWh
|
$0.076 | |
Electricity Demand | $78,579 | 9,583 |
kW-mo/yr
|
$8.20 | |
Electricity Fees | $47,491 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $5,900 | 3,608 |
Tgal
|
$1.64 | |
TOTAL YEARLY COSTS | $408,518 | ||||
RECOMMENDED SAVINGS* | $189,648 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,674 | $31,572 |
$7,726
101,256
kWh
|
$1,948
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,473 | $5,609 |
$9,508
124,609
kWh
|
$1,965
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,389 | - |
$3,637
47,668
kWh
|
$752
-
kW-mo/yr
|
- | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $146,777 | $515,060 |
$8,443
110,654
kWh
|
$2,643
-
kW-mo/yr
|
$135,692 | |
05 | 2.3212: Optimize plant power factor | $17,336 | $25,437 | - |
$17,336
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $189,648 | $577,679 |
$29,313
384,186
kWh
|
$24,643
-
kW-mo/yr
|
$135,692 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs