ITAC Assessment: NT0021
ITAC logo
ITAC Assessment: NT0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Injection Molded Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 65,000
ft2
Annual Production 1,670,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,508 3,042,537
kWh
Electricity Demand $112,485 6,706
kW-mo/yr
Electricity Fees $17,136 -
Waste Disposal Costs
Water Usage $29,434 1,902
Tgal
Solid Waste (non-haz) $44,436 20,000
lb
TOTAL YEARLY COSTS $497,999
RECOMMENDED SAVINGS* $168,341 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,801 $7,120 $7,104
73,391
kWh
$3,697
-
kW-mo/yr
- - -
02 2.3212: Optimize plant power factor $19,175 $6,411 - $19,175
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,153 $11,393 $2,168
22,399
kWh
$985
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,821 $5,609 $4,690
48,449
kWh
$2,131
-
kW-mo/yr
- - -
05 2.7221: Lower temperature during the winter season and vice-versa $2,130 - $2,130
22,009
kWh
- - - -
06 4.812: Apply for investment incentives $16,970 - - - $16,970 - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $21,290 $19,507 - - - - $21,290
08 2.4322: Use or replace with energy efficient substitutes $88,000 $94,845 - - - $88,000 -
TOTAL RECOMMENDED $168,341 $144,884 $16,093
166,248
kWh
$25,988
-
kW-mo/yr
$16,970 $88,000 $21,290
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs