ITAC Assessment: NT0020
ITAC logo
ITAC Assessment: NT0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product helicopter blades
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 180
Plant Area 160,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 5,356
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,683 6,060,235
kWh
Electricity Demand $266,665 13,536
kW-mo/yr
Electricity Fees $45,795 -
Natural Gas $242,913 23,419
MMBtu
Waste Disposal Costs
Water Usage $15,182 2,097
Tgal
TOTAL YEARLY COSTS $1,087,238
RECOMMENDED SAVINGS* $258,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,491 $4,553 $6,254
73,322
kWh
$3,236
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $18,251 - $12,027
141,001
kWh
$6,223
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $33,277 $33,920 $21,930
257,088
kWh
$11,347
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $3,147 $11,909 - - $3,147
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,816 $16,551 $18,331
214,905
kWh
$9,485
-
kW-mo/yr
- -
06 4.812: Apply for investment incentives $52,462 - - - - $52,462
07 2.7232: Replace existing hvac unit with high efficiency model $113,865 $96,040 $9,137
107,120
kWh
$4,728
-
kW-mo/yr
- $100,000
TOTAL RECOMMENDED $258,309 $162,973 $67,680
793,436
kWh
$35,020
-
kW-mo/yr
$3,147
-
MMBtu
$152,462
TOTAL IMPLEMENTED $80,204 $4,553 $18,282
214,323
kWh
$9,460
-
kW-mo/yr
- $52,462
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs