ITAC Assessment: NT0019
ITAC logo
ITAC Assessment: NT0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Carbon and Graphite Products
NAICS 335991: Carbon and Graphite Product Manufacturing
SIC 3624: Carbon and Graphite Products
Sales Range $50
M
to 100
M
# of Employees 315
Plant Area 365,000
ft2
Annual Production 1,200,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,203,374 30,977,724
kWh
Electricity Demand $203,627 9,821
kW-mo/yr
Electricity Fees $15,799 -
Natural Gas $157,531 79,246
MMBtu
Waste Disposal Costs
Water Usage $220,838 18,829
Tgal
TOTAL YEARLY COSTS $1,801,170
RECOMMENDED SAVINGS* $140,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $60,556 $294,320 - - - $60,556
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,486 $33,471 $10,096
260,217
kWh
$7,389
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $36,036 $9,814 - $36,036
-
kW-mo/yr
- -
04 4.812: Apply for investment incentives $12,574 - - - $12,574 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,487 $4,553 $7,788
200,725
kWh
$5,699
-
kW-mo/yr
- -
TOTAL RECOMMENDED $140,139 $342,158 $17,885
460,942
kWh
$49,125
-
kW-mo/yr
$12,574 $60,556
-
MMBtu
TOTAL IMPLEMENTED - - - - - -