Assessment Year | 2023 |
---|---|
Principal Product | Sheet Metal Work Manufacturing |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 68 |
Plant Area |
70,200
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 3,312
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $69,890 | 1,722,000 |
kWh
|
$0.041 | |
Electricity Demand | $58,847 | 6,138 |
kW-mo/yr
|
$9.59 | |
Electricity Fees | $2,778 | - |
|
- | |
Natural Gas | $31,072 | 27,331 |
MMBtu
|
$1.14 | |
Waste Disposal Costs | |||||
Water Usage | $12,540 | 40 |
Tgal
|
$314.88 | |
TOTAL YEARLY COSTS | $175,127 | ||||
RECOMMENDED SAVINGS* | $18,585 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,640 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,648 | $5,609 |
$1,975
48,173
kWh
|
$1,673
-
kW-mo/yr
|
- | - | |
02 | 2.3212: Optimize plant power factor | $9,915 | $5,598 | - |
$9,915
-
kW-mo/yr
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,242 | $1,258 | - | - |
$1,242
-
MMBtu
|
- | |
04 | 2.7425: Clean or color roof to reduce solar load | $2,030 | $2,800 |
$840
20,488
kWh
|
$1,190
-
kW-mo/yr
|
- | - | |
05 | 3.5316: Contract a wood pallet recycling company | $349 | - | - | - | - | $349 | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,401 | - |
$1,401
34,182
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $18,585 | $15,265 |
$4,217
102,842
kWh
|
$12,777
-
kW-mo/yr
|
$1,242
-
MMBtu
|
$349 | ||
TOTAL IMPLEMENTED | $6,640 | $6,867 |
$3,377
82,354
kWh
|
$1,673
-
kW-mo/yr
|
$1,242
-
MMBtu
|
$349 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs