ITAC Assessment: NT0009
ITAC logo
ITAC Assessment: NT0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Metal Coating, Engraving (except jewelry and silverware), and Allied Services to Manufacturers
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 85,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 2,016
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,909 1,282,800
kWh
Electricity Demand $80,412 8,004
kW-mo/yr
Electricity Fees $16,217 -
Natural Gas $221,284 27,296
MMBtu
Waste Disposal Costs
Water Usage $96,035 5,970
Tgal
TOTAL YEARLY COSTS $475,858
RECOMMENDED SAVINGS* $113,921 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,911

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,911 $5,609 $851
17,730
kWh
$1,060
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $7,305 $1,258 - - $7,305
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,822 $32,367 $3,926
81,793
kWh
$4,896
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $13,598 $10,844 - $13,598
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,796 $18,600 - - - $3,796
06 2.4313: Provide proper maintenance of motor driven equipment $78,488 $41,034 $2,537
52,845
kWh
$3,951
-
kW-mo/yr
- $72,000
TOTAL RECOMMENDED $113,921 $109,711 $7,314
152,368
kWh
$23,505
-
kW-mo/yr
$7,305
-
MMBtu
$75,796
TOTAL IMPLEMENTED $1,911 $5,609 $851
17,730
kWh
$1,060
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs