ITAC Assessment: NT0004
ITAC logo
ITAC Assessment: NT0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Railroad Rolling Stock Manufacturing
NAICS 336510: Railroad Rolling Stock Manufacturing
SIC 3743: Railroad Equipment
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 1,000,000
ft2
Annual Production 294
pieces
Production Hrs. Annual 4,032
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,307,419 13,979,212
kWh
Electricity Demand $347,419 38,438
kW-mo/yr
Electricity Fees $158,276 -
Natural Gas $222,765 20,997
MMBtu
Waste Disposal Costs
Water Usage $105,394 4,253
Tgal
TOTAL YEARLY COSTS $2,141,273
RECOMMENDED SAVINGS* $150,675 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,687 $5,993 $6,754
71,846
kWh
$1,933
-
kW-mo/yr
02 2.7425: Clean or color roof to reduce solar load $38,000 $38,000 $26,600
282,878
kWh
$11,400
-
kW-mo/yr
03 2.7124: Make a practice of turning off lights when not needed $29,874 - $23,999
255,312
kWh
$5,875
-
kW-mo/yr
04 2.3212: Optimize plant power factor $27,237 $63,579 - $27,237
-
kW-mo/yr
05 2.7221: Lower temperature during the winter season and vice-versa $735 - $735
7,816
kWh
-
06 2.7221: Lower temperature during the winter season and vice-versa $27,449 - $27,449
292,431
kWh
-
07 2.8227: Adjust / maintain fork lift trucks for most efficient operation $18,694 - $17,803
189,389
kWh
$892
-
kW-mo/yr
TOTAL RECOMMENDED $150,675 $107,572 $103,338
1,099,671
kWh
$47,337
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs