ITAC Assessment: NL0129
ITAC logo
ITAC Assessment: NL0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Processed Meat
NAICS 311612: Meat Processed from Carcasses
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 36
Plant Area 46,903
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,987 4,397,227
kWh
Electricity Demand $81,916 10,351
kW-mo/yr
Electricity Fees $21,401 -
Natural Gas $10,156 1,702
MMBtu
Other Gas $5,877 1
MMBtu
Waste Disposal Costs
Water Usage $20,861 6,755
Tgal
Water Disposal $79,629 6,755
Tgal
Other Liquid (non-haz) $23,263 1
gal
TOTAL YEARLY COSTS $508,090
RECOMMENDED SAVINGS* $15,970,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $15,722,064 $5,073,962 - - - $1,820
-
Tgal
$6,947
-
Tgal
- $(-364,827.0) - $16,078,124
02 2.4321: Upgrade obsolete equipment $226,046 $346,302 $(-2,363.0)
(-39,389)
kWh
$(-4,871.0)
-
kW-mo/yr
- - - - - $233,280 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,072 $41,500 $13,072
217,872
kWh
- - - - - - - -
04 2.8121: Apply for tax-free status for energy purchases $8,173 $264 - - $709
-
MMBtu
- - $7,464
-
gal
- - -
05 2.7135: Install occupancy sensors $778 $1,744 $778
12,965
kWh
- - - - - - - -
TOTAL RECOMMENDED $15,970,133 $5,463,772 $11,487
191,448
kWh
$(-4,871.0)
-
kW-mo/yr
$709
-
MMBtu
$1,820
-
Tgal
$6,947
-
Tgal
$7,464
-
gal
$(-364,827.0) $233,280 $16,078,124
TOTAL IMPLEMENTED - - - - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs