Assessment Year | 2025 |
---|---|
Principal Product | Patient Care |
NAICS | 622110: General Medical and Surgical Hospitals |
SIC | 8062: General Medical and Surgical Hospitals |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
37,520
ft2
|
Annual Production | 12,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $63,143 | 1,152,316 |
kWh
|
$0.055 | |
Electricity Demand | $32,072 | 2,342 |
kW-mo/yr
|
$13.69 | |
Natural Gas | $15,627 | 1,866 |
MMBtu
|
$8.37 | |
Other Gas | $106 | 1 |
MMBtu
|
$106.00 | |
Waste Disposal Costs | |||||
Water Usage | $1,809 | 562 |
Tgal
|
$3.22 | |
Water Disposal | $1,745 | 562 |
Tgal
|
$3.10 | |
Other Liquid (non-haz) | $2,795 | 1 |
gal
|
$2,795.00 | |
TOTAL YEARLY COSTS | $117,297 | ||||
RECOMMENDED SAVINGS* | $1,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $440 | $783 |
$270
4,916
kWh
|
$170
-
kW-mo/yr
|
- | - | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $379 | $1,435 |
$379
6,892
kWh
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $219 | $248 |
$173
3,137
kWh
|
- | $25 | $21 | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $112 | $547 |
$83
1,518
kWh
|
$29
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $38 | $58 |
$23
418
kWh
|
$15
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $1,188 | $3,071 |
$928
16,881
kWh
|
$214
-
kW-mo/yr
|
$25 | $21 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs