Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 10
Plant Area 23,590
ft2
Annual Production 109,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,388 1,515,767
kWh
Natural Gas $3,870 301
MMBtu
Waste Disposal Costs
Water Usage $6,566 1,310
Tgal
TOTAL YEARLY COSTS $126,824
RECOMMENDED SAVINGS* $36,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,173 $106,000 $34,173
446,120
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $887 $240 $887
11,580
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $352 $1,758 $10
133
kWh
$341
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $225 $428 $67
880
kWh
$59
-
kW-mo/yr
$98
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $159 $140 $16
212
kWh
$143
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $114 $428 $114
1,498
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $110 $355 $34
438
kWh
$71
-
kW-mo/yr
$4
TOTAL RECOMMENDED $36,019 $109,349 $35,302
460,861
kWh
$615
-
kW-mo/yr
$102
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs