Assessment Year | 2025 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 10 |
Plant Area |
23,590
ft2
|
Annual Production | 109,500
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $116,388 | 1,515,767 |
kWh
|
$0.077 | |
Natural Gas | $3,870 | 301 |
MMBtu
|
$12.85 | |
Waste Disposal Costs | |||||
Water Usage | $6,566 | 1,310 |
Tgal
|
$5.01 | |
TOTAL YEARLY COSTS | $126,824 | ||||
RECOMMENDED SAVINGS* | $36,019 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $34,173 | $106,000 |
$34,173
446,120
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $887 | $240 |
$887
11,580
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $352 | $1,758 |
$10
133
kWh
|
$341
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $225 | $428 |
$67
880
kWh
|
$59
-
kW-mo/yr
|
$98 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $159 | $140 |
$16
212
kWh
|
$143
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $114 | $428 |
$114
1,498
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $110 | $355 |
$34
438
kWh
|
$71
-
kW-mo/yr
|
$4 | |
TOTAL RECOMMENDED | $36,019 | $109,349 |
$35,302
460,861
kWh
|
$615
-
kW-mo/yr
|
$102 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs