| Assessment Year | 2023 |
|---|---|
| Principal Product | Ham Products |
| NAICS | 311612: Meat Processed from Carcasses |
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
28,696
ft2
|
| Annual Production | 7,000,000
lb
|
| Production Hrs. Annual | 3,188
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $55,291 | 2,331,845 |
kWh
|
$0.024 | |
| Electricity Demand | $149,259 | 7,104 |
kW-mo/yr
|
$21.01 | |
| Electricity Fees | $11,422 | - |
|
- | |
| Natural Gas | $82,600 | 26,074 |
MMBtu
|
$3.17 | |
| Waste Disposal Costs | |||||
| Water Usage | $30,216 | 8,470 |
Tgal
|
$3.57 | |
| Water Disposal | $40,190 | 8,470 |
Tgal
|
$4.74 | |
| TOTAL YEARLY COSTS | $368,978 | ||||
| RECOMMENDED SAVINGS* | $25,869 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $17,479 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7229: Air condition only space necessary | $13,412 | $7,500 |
$13,412
570,709
kWh
|
- | - | |
| 02 | 2.2437: Recover waste heat from equipment | $7,755 | $28,900 | - | - |
$7,755
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,087 | $1,652 |
$718
29,934
kWh
|
$2,369
-
kW-mo/yr
|
- | |
| 04 | 2.2511: Insulate bare equipment | $980 | $404 |
$446
18,571
kWh
|
$535
-
kW-mo/yr
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $635 | $575 |
$148
6,159
kWh
|
$487
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $25,869 | $39,031 |
$14,724
625,373
kWh
|
$3,391
-
kW-mo/yr
|
$7,755
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,479 | $9,556 |
$14,576
619,214
kWh
|
$2,904
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs