| Assessment Year | 2020 |
|---|---|
| Principal Product | Flexible Magnets |
| NAICS | 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing |
| SIC | 3264: Porcelain Electrical Supplies |
| Sales Range | $5 M to 10M |
| # of Employees | 16 |
| Plant Area |
114,000
ft2
|
| Annual Production | 7,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $87,155 | 3,227,962 |
kWh
|
$0.027 | |
| Electricity Demand | $159,876 | 7,444 |
kW-mo/yr
|
$21.48 | |
| Electricity Fees | $54,133 | - |
|
- | |
| Natural Gas | $79,766 | 12,223 |
MMBtu
|
$6.53 | |
| Waste Disposal Costs | |||||
| Water Usage | $6,721 | 2,444 |
Tgal
|
$2.75 | |
| Water Disposal | $3,382 | 1,116 |
Tgal
|
$3.03 | |
| TOTAL YEARLY COSTS | $391,033 | ||||
| RECOMMENDED SAVINGS* | $47,232 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $19,447 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $24,034 | $128 | - |
$24,034
-
kW-mo/yr
|
- | - | - | - | - | |
| 02 | 2.1221: Replace obsolete burners with more efficient ones | $12,899 | $13,024 | - | - |
$12,899
-
MMBtu
|
- | - | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,482 | $984 |
$2,286
84,658
kWh
|
$3,196
-
kW-mo/yr
|
- | - | - | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $3,333 | $13,737 |
$1,297
48,040
kWh
|
$2,036
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $631 | $500 |
$987
36,543
kWh
|
- | - | - | - | $(-256.0) | $(-100.0) | |
| 06 | 3.4154: Eliminate leaks in water lines and valves | $435 | $85 | - | - | - |
$248
-
Tgal
|
$273
-
Tgal
|
$(-64.0) | $(-21.0) | |
| 07 | 2.7135: Install occupancy sensors | $418 | $1,250 |
$418
15,480
kWh
|
- | - | - | - | - | - | |
| TOTAL RECOMMENDED | $47,232 | $29,708 |
$4,988
184,721
kWh
|
$29,266
-
kW-mo/yr
|
$12,899
-
MMBtu
|
$248
-
Tgal
|
$273
-
Tgal
|
$(-320.0) | $(-121.0) | ||
| TOTAL IMPLEMENTED | $19,447 | $14,593 |
$3,273
121,201
kWh
|
$3,196
-
kW-mo/yr
|
$12,899
-
MMBtu
|
$248
-
Tgal
|
$273
-
Tgal
|
$(-320.0) | $(-121.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs