Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Flexible Magnets
NAICS 327110: Pottery, Ceramics, and Plumbing Fixture Manufacturing
SIC 3264: Porcelain Electrical Supplies
Sales Range $5
M
to 10
M
# of Employees 16
Plant Area 114,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,155 3,227,962
kWh
Electricity Demand $159,876 7,444
kW-mo/yr
Electricity Fees $54,133 -
Natural Gas $79,766 12,223
MMBtu
Waste Disposal Costs
Water Usage $6,721 2,444
Tgal
Water Disposal $3,382 1,116
Tgal
TOTAL YEARLY COSTS $391,033
RECOMMENDED SAVINGS* $47,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $24,034 $128 - $24,034
-
kW-mo/yr
- - - - -
02 2.1221: Replace obsolete burners with more efficient ones $12,899 $13,024 - - $12,899
-
MMBtu
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,482 $984 $2,286
84,658
kWh
$3,196
-
kW-mo/yr
- - - - -
04 2.4133: Use most efficient type of electric motors $3,333 $13,737 $1,297
48,040
kWh
$2,036
-
kW-mo/yr
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $631 $500 $987
36,543
kWh
- - - - $(-256.0) $(-100.0)
06 3.4154: Eliminate leaks in water lines and valves $435 $85 - - - $248
-
Tgal
$273
-
Tgal
$(-64.0) $(-21.0)
07 2.7135: Install occupancy sensors $418 $1,250 $418
15,480
kWh
- - - - - -
TOTAL RECOMMENDED $47,232 $29,708 $4,988
184,721
kWh
$29,266
-
kW-mo/yr
$12,899
-
MMBtu
$248
-
Tgal
$273
-
Tgal
$(-320.0) $(-121.0)
TOTAL IMPLEMENTED $19,447 $14,593 $3,273
121,201
kWh
$3,196
-
kW-mo/yr
$12,899
-
MMBtu
$248
-
Tgal
$273
-
Tgal
$(-320.0) $(-121.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs