ITAC Assessment: NL0048
ITAC logo
ITAC Assessment: NL0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Automotive Belts
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area 1,100,000
ft2
Annual Production 8,262,349
units
Production Hrs. Annual 5,600
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $625,580 26,355,939
kWh
Electricity Demand $886,645 51,104
kW-mo/yr
Electricity Fees $77,854 -
Natural Gas $1,178,050 424,798
MMBtu
LPG $21,962 1,803
MMBtu
Waste Disposal Costs
Water Usage $170,348 95,082
Tgal
Water Disposal $154,051 95,082
Tgal
TOTAL YEARLY COSTS $3,114,490
RECOMMENDED SAVINGS* $132,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $71,559 $111,731 $22,244
926,826
kWh
$35,685
-
kW-mo/yr
- - - $13,630 - -
02 2.3212: Optimize plant power factor $24,509 $66,100 - - $24,509 - - - - -
03 2.1332: Convert combustion equipment to burn natural gas $22,004 $20,500 - - - $(-4,999.0)
-
MMBtu
$21,963
-
MMBtu
- $5,040 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,955 $4,000 $9,805
408,555
kWh
- - - - $(-1,600.0) - $(-250.0)
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,824 $50 - $5,824
-
kW-mo/yr
- - - - - -
06 3.5311: Recover and reuse waste material $664 $3,180 - - - - - - - $664
TOTAL RECOMMENDED $132,515 $205,561 $32,049
1,335,381
kWh
$41,509
-
kW-mo/yr
$24,509 $(-4,999.0)
-
MMBtu
$21,963
-
MMBtu
$12,030 $5,040 $414
TOTAL IMPLEMENTED $85,338 $115,781 $32,049
1,335,381
kWh
$41,509
-
kW-mo/yr
- - - $12,030 - $(-250.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs