ITAC Assessment: NL0039
ITAC logo
ITAC Assessment: NL0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bacon Bits
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 137
Plant Area 45,000
ft2
Annual Production 23,000,000
units
Production Hrs. Annual 7,900
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,968 4,378,200
kWh
Electricity Demand $155,229 9,758
kW-mo/yr
Electricity Fees $275 -
Natural Gas $132,325 30,970
MMBtu
Waste Disposal Costs
Water Usage $23,408 13,926
Tgal
Water Disposal $16,037 13,747
Tgal
TOTAL YEARLY COSTS $542,243
RECOMMENDED SAVINGS* $87,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,390

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $36,367 $39,000 - - $36,367 - - - - -
02 2.2113: Repair or replace steam traps $15,324 $44 - - - $16,380
-
MMBtu
- - $(-1,056.0) -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,128 $2,497 $8,644
176,415
kWh
$5,483
-
kW-mo/yr
- - - - - -
04 3.4151: Minimize water usage $10,832 $1,127 - - - $3,059
-
MMBtu
$4,589
-
Tgal
$3,183
-
Tgal
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,739 $1,600 $11,191
228,393
kWh
- - - - - $(-352.0) $(-100.0)
TOTAL RECOMMENDED $87,390 $44,268 $19,835
404,808
kWh
$5,483
-
kW-mo/yr
$36,367 $19,439
-
MMBtu
$4,589
-
Tgal
$3,183
-
Tgal
$(-1,408.0) $(-100.0)
TOTAL IMPLEMENTED $87,390 $44,268 $19,835
404,808
kWh
$5,483
-
kW-mo/yr
$36,367 $19,439
-
MMBtu
$4,589
-
Tgal
$3,183
-
Tgal
$(-1,408.0) $(-100.0)