ITAC Assessment: NL0038
ITAC logo
ITAC Assessment: NL0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Clay Products
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3251: Brick and Structural Clay Tile
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 380,000
ft2
Annual Production 261,520,200
units
Production Hrs. Annual 4,992
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $632,174 12,289,200
kWh
Electricity Demand $423,251 25,542
kW-mo/yr
TOTAL YEARLY COSTS $1,055,425
RECOMMENDED SAVINGS* $48,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3191: Use demand controller or load shedder $16,358 $20,000 - $16,358
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,352 $25,229 $8,621
169,028
kWh
$6,731
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,806 $4,500 $12,806
258,300
kWh
-
04 2.4131: Size electric motors for peak operating efficiency $4,391 $31,162 $2,542
49,842
kWh
$1,849
-
kW-mo/yr
TOTAL RECOMMENDED $48,907 $80,891 $23,969
477,170
kWh
$24,938
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs