ITAC Assessment: NL0037
ITAC logo
ITAC Assessment: NL0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 27
Plant Area 180,020
ft2
Annual Production 142,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $367,474 7,044,800
kWh
Electricity Demand $113,032 12,596
kW-mo/yr
Natural Gas $42,119 9,912
MMBtu
Waste Disposal Costs
Water Usage $375 355
Tgal
TOTAL YEARLY COSTS $523,000
RECOMMENDED SAVINGS* $82,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4131: Size electric motors for peak operating efficiency $59,550 $111,550 $44,990
917,950
kWh
$14,560
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,092 $690 $21,092
430,444
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,899 $2,807 $1,387
28,295
kWh
$512
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $130 $46 $272
5,589
kWh
- $(-92.0) $(-50.0)
TOTAL RECOMMENDED $82,671 $115,093 $67,741
1,382,278
kWh
$15,072
-
kW-mo/yr
$(-92.0) $(-50.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs