ITAC Assessment: NL0033
ITAC logo
ITAC Assessment: NL0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Industrial Boilers
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 196,000
ft2
Annual Production 400
units
Production Hrs. Annual 5,500
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,328 2,415,091
kWh
Electricity Demand $123,270 7,570
kW-mo/yr
Electricity Fees $14,836 -
Natural Gas $155,374 25,332
MMBtu
Waste Disposal Costs
Water Usage $4,994 2,096
Tgal
Water Disposal $5,655 2,096
Tgal
TOTAL YEARLY COSTS $379,456
RECOMMENDED SAVINGS* $67,702 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,528

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $39,609 $71,240 - - $39,609
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $26,635 $42,417 $10,342
333,616
kWh
$16,293
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $919 $1,000 $1,219
39,322
kWh
- - - $(-200.0) $(-100.0)
04 3.4156: Use flow control valves on equipment to optimize water use $539 $100 - - - $539
-
Tgal
- -
TOTAL RECOMMENDED $67,702 $114,757 $11,561
372,938
kWh
$16,293
-
kW-mo/yr
$39,609
-
MMBtu
$539
-
Tgal
$(-200.0) $(-100.0)
TOTAL IMPLEMENTED $40,528 $72,240 $1,219
39,322
kWh
- $39,609
-
MMBtu
- $(-200.0) $(-100.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs