| Assessment Year | 2019 |
|---|---|
| Principal Product | Industrial Boilers |
| NAICS | 332410: Power Boiler and Heat Exchanger Manufacturing |
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $100 M to 500M |
| # of Employees | 200 |
| Plant Area |
196,000
ft2
|
| Annual Production | 400
units
|
| Production Hrs. Annual | 5,500
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $75,328 | 2,415,091 |
kWh
|
$0.031 | |
| Electricity Demand | $123,270 | 7,570 |
kW-mo/yr
|
$16.28 | |
| Electricity Fees | $14,836 | - |
|
- | |
| Natural Gas | $155,374 | 25,332 |
MMBtu
|
$6.13 | |
| Waste Disposal Costs | |||||
| Water Usage | $4,994 | 2,096 |
Tgal
|
$2.38 | |
| Water Disposal | $5,655 | 2,096 |
Tgal
|
$2.70 | |
| TOTAL YEARLY COSTS | $379,456 | ||||
| RECOMMENDED SAVINGS* | $67,702 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $40,528 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $39,609 | $71,240 | - | - |
$39,609
-
MMBtu
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,635 | $42,417 |
$10,342
333,616
kWh
|
$16,293
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $919 | $1,000 |
$1,219
39,322
kWh
|
- | - | - | $(-200.0) | $(-100.0) | |
| 04 | 3.4156: Use flow control valves on equipment to optimize water use | $539 | $100 | - | - | - |
$539
-
Tgal
|
- | - | |
| TOTAL RECOMMENDED | $67,702 | $114,757 |
$11,561
372,938
kWh
|
$16,293
-
kW-mo/yr
|
$39,609
-
MMBtu
|
$539
-
Tgal
|
$(-200.0) | $(-100.0) | ||
| TOTAL IMPLEMENTED | $40,528 | $72,240 |
$1,219
39,322
kWh
|
- |
$39,609
-
MMBtu
|
- | $(-200.0) | $(-100.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs