Assessment Year | 2019 |
---|---|
Principal Product | Custom Molded Rubber Products |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 66 |
Plant Area |
60,000
ft2
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,072
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $133,125 | 1,955,844 |
kWh
|
$0.068 | |
Electricity Demand | $30,326 | 3,702 |
kW-mo/yr
|
$8.19 | |
Electricity Fees | $5,316 | - |
|
- | |
Natural Gas | $9,786 | 1,852 |
MMBtu
|
$5.29 | |
Waste Disposal Costs | |||||
Water Usage | $27,441 | 12,717 |
Tgal
|
$2.16 | |
Water Disposal | $43,984 | 12,717 |
Tgal
|
$3.46 | |
TOTAL YEARLY COSTS | $249,979 | ||||
RECOMMENDED SAVINGS* | $41,571 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $17,560 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.4114: Replace city water with recycled water via cooling tower | $23,879 | $45,000 |
$(-2,240.0)
(-32,938)
kWh
|
- |
$10,035
-
Tgal
|
$16,084
-
Tgal
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,950 | $52,450 |
$10,466
153,300
kWh
|
$2,484
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2511: Insulate bare equipment | $3,028 | $4,631 |
$3,028
44,528
kWh
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,582 | $1,600 |
$2,740
40,306
kWh
|
- | - | - | $(-1,058.0) | $(-100.0) | |
05 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $132 | $474 |
$132
1,947
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $41,571 | $104,155 |
$14,126
207,143
kWh
|
$2,484
-
kW-mo/yr
|
$10,035
-
Tgal
|
$16,084
-
Tgal
|
$(-1,058.0) | $(-100.0) | ||
TOTAL IMPLEMENTED | $17,560 | $58,681 |
$16,234
238,134
kWh
|
$2,484
-
kW-mo/yr
|
- | - | $(-1,058.0) | $(-100.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs