ITAC Assessment: NL0028
ITAC logo
ITAC Assessment: NL0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Custom Molded Rubber Products
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area 60,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 6,072
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,125 1,955,844
kWh
Electricity Demand $30,326 3,702
kW-mo/yr
Electricity Fees $5,316 -
Natural Gas $9,786 1,852
MMBtu
Waste Disposal Costs
Water Usage $27,441 12,717
Tgal
Water Disposal $43,984 12,717
Tgal
TOTAL YEARLY COSTS $249,979
RECOMMENDED SAVINGS* $41,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.4114: Replace city water with recycled water via cooling tower $23,879 $45,000 $(-2,240.0)
(-32,938)
kWh
- $10,035
-
Tgal
$16,084
-
Tgal
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,950 $52,450 $10,466
153,300
kWh
$2,484
-
kW-mo/yr
- - - -
03 2.2511: Insulate bare equipment $3,028 $4,631 $3,028
44,528
kWh
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,582 $1,600 $2,740
40,306
kWh
- - - $(-1,058.0) $(-100.0)
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $132 $474 $132
1,947
kWh
- - - - -
TOTAL RECOMMENDED $41,571 $104,155 $14,126
207,143
kWh
$2,484
-
kW-mo/yr
$10,035
-
Tgal
$16,084
-
Tgal
$(-1,058.0) $(-100.0)
TOTAL IMPLEMENTED $17,560 $58,681 $16,234
238,134
kWh
$2,484
-
kW-mo/yr
- - $(-1,058.0) $(-100.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs