ITAC Assessment: LE0239
ITAC logo
ITAC Assessment: LE0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product polyols
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 128
Plant Area 2,530,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,399,629 23,188,060
kWh
Natural Gas $1,342,166 129,901
MMBtu
Fuel Oil #6 $6,477,208 962,965
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,046,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 2.2121: Increase amount of condensate returned $392,390 $95,000 - - $337,162
-
MMBtu
$25,221
-
Tgal
$30,007
-
Tgal
02 2.2135: Repair and eliminate steam leaks $280,038 $31,000 - - $280,038
-
MMBtu
- -
03 2.2121: Increase amount of condensate returned $204,235 $200,000 - - $188,050
-
MMBtu
$7,391
-
Tgal
$8,794
-
Tgal
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $115,069 $20,000 $101,131
1,685,517
kWh
$13,938
-
kW-mo/yr
- - -
05 2.2514: Cover open tanks $23,836 $30,000 - - $23,836
-
MMBtu
- -
06 2.2414: Use waste heat from hot flue gases to preheat $14,473 $28,000 - - $14,473
-
MMBtu
- -
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $10,599 $7,500 - - $10,599
-
MMBtu
- -
08 2.2136: Install / repair insulation on steam lines $4,312 $2,528 - - $4,312
-
MMBtu
- -
09 2.4112: Install soft-start to eliminate nuisance trips $1,132 $6,000 - $1,132
-
kW-mo/yr
- - -
10 2.1131: Repair faulty insulation in furnaces, boilers, etc $355 $500 - - $355
-
MMBtu
- -
TOTAL RECOMMENDED $1,046,439 $420,528 $101,131
1,685,517
kWh
$15,070
-
kW-mo/yr
$858,825
-
MMBtu
$32,612
-
Tgal
$38,801
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs