ITAC Assessment: AM0845
ITAC logo
ITAC Assessment: AM0845
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Sanitized waste water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 292,545
ft2
Annual Production 912,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,772 4,536,626
kWh
Electricity Demand $73,104 9,910
kW-mo/yr
Electricity Fees $8,745 -
TOTAL YEARLY COSTS $264,621
RECOMMENDED SAVINGS* $99,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $99,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 3.1191: Change procedures / equipment / operating conditions $50,900 $9,100 $50,900
1,264,000
kWh
- -
02 3.1191: Change procedures / equipment / operating conditions $33,965 $13,500 $26,300
653,500
kWh
$7,665
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $9,077 $27,090 - $9,077
-
kW-mo/yr
-
04 2.8123: Pay utility bills on time $1,114 - - - $1,114
05 2.7135: Install occupancy sensors $649 $360 $649
16,096
kWh
- -
06 2.4314: Use synthetic lubricant $302 $700 $252
6,259
kWh
$50
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,709 $15,704 $2,421
60,084
kWh
$1,288
-
kW-mo/yr
-
TOTAL RECOMMENDED $99,716 $66,454 $80,522
1,999,939
kWh
$18,080
-
kW-mo/yr
$1,114
TOTAL IMPLEMENTED $99,716 $66,454 $80,522
1,999,939
kWh
$18,080
-
kW-mo/yr
$1,114
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs