ITAC Assessment: NL0024
ITAC logo
ITAC Assessment: NL0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Semi-Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 68,770
ft2
Annual Production 500
units
Production Hrs. Annual 2,500
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,111 754,457
kWh
Electricity Demand $71,463 3,408
kW-mo/yr
Natural Gas $30,426 6,508
MMBtu
Waste Disposal Costs
Water Usage $4,355 2,329
Tgal
Water Disposal $7,430 2,329
Tgal
TOTAL YEARLY COSTS $174,784
RECOMMENDED SAVINGS* $30,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,239 $33,526 $10,726
132,418
kWh
$13,048
-
kW-mo/yr
- $465 -
02 2.7243: Improve air circulation with destratification fans / other methods $5,242 $10,000 $(-158.0)
(-1,956)
kWh
- - - $5,400
03 2.4231: Reduce the pressure of compressed air to the minimum required $571 - $571
7,050
kWh
- - - -
04 3.4155: Meter waste water $319 - - - $319
-
Tgal
- -
TOTAL RECOMMENDED $30,371 $43,526 $11,139
137,512
kWh
$13,048
-
kW-mo/yr
$319
-
Tgal
$465 $5,400
TOTAL IMPLEMENTED $24,239 $33,526 $10,726
132,418
kWh
$13,048
-
kW-mo/yr
- $465 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs