ITAC Assessment: NL0018
ITAC logo
ITAC Assessment: NL0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 9
Plant Area 1,176,000
ft2
Annual Production 1,457,950
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,787 3,371,200
kWh
Electricity Demand $3,540 467
kW-mo/yr
Electricity Fees $83,723 -
Natural Gas $58,883 11,341
MMBtu
Waste Disposal Costs
Water Usage $36,342 20,185
Tgal
TOTAL YEARLY COSTS $371,275
RECOMMENDED SAVINGS* $38,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4131: Size electric motors for peak operating efficiency $24,300 $149,000 $20,500
366,000
kWh
$3,800
-
kW-mo/yr
- - -
02 2.2211: Use optimum temperature $9,300 $210 $1,800
32,142
kWh
$(-320.0)
-
kW-mo/yr
$7,820
-
MMBtu
- -
03 2.7135: Install occupancy sensors $3,700 $2,500 $2,958
52,800
kWh
- - $380 $362
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,100 $820 $1,100
19,643
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $440 $210 $116
2,071
kWh
- - $324 -
TOTAL RECOMMENDED $38,840 $152,740 $26,474
472,656
kWh
$3,480
-
kW-mo/yr
$7,820
-
MMBtu
$704 $362
TOTAL IMPLEMENTED $14,540 $3,740 $5,974
106,656
kWh
$(-320.0)
-
kW-mo/yr
$7,820
-
MMBtu
$704 $362
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs