Assessment Year | 2017 |
---|---|
Principal Product | Pork Products |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $100 M to 500M |
# of Employees | 475 |
Plant Area |
300,000
ft2
|
Annual Production | 365,000,000
units
|
Production Hrs. Annual | 3,600
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $588,274 | 22,988,750 |
kWh
|
$0.026 | |
Electricity Demand | $888,155 | 43,938 |
kW-mo/yr
|
$20.21 | |
Electricity Fees | $63,264 | - |
|
- | |
Natural Gas | $696,000 | 161,000 |
MMBtu
|
$4.32 | |
Waste Disposal Costs | |||||
Water Usage | $10,000 | 5,832 |
Tgal
|
$1.71 | |
TOTAL YEARLY COSTS | $2,245,693 | ||||
RECOMMENDED SAVINGS* | $175,950 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $105,750 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $62,200 | $77,400 | - | - |
$62,200
-
MMBtu
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $47,300 | $5,400 |
$49,000
1,930,000
kWh
|
- | - | - | $(-1,700.0) | |
03 | 3.4156: Use flow control valves on equipment to optimize water use | $36,200 | $1,700 | - | - |
$26,200
-
MMBtu
|
$10,000
-
Tgal
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,300 | $67,600 |
$7,448
291,700
kWh
|
$8,852
-
kW-mo/yr
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $8,000 | $3,100 |
$3,294
126,600
kWh
|
$4,706
-
kW-mo/yr
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,250 | $12,000 |
$3,250
127,000
kWh
|
- | - | - | - | |
07 | 2.2511: Insulate bare equipment | $2,700 | $840 | - | - |
$2,700
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $175,950 | $168,040 |
$62,992
2,475,300
kWh
|
$13,558
-
kW-mo/yr
|
$91,100
-
MMBtu
|
$10,000
-
Tgal
|
$(-1,700.0) | ||
TOTAL IMPLEMENTED | $105,750 | $87,540 |
$59,698
2,348,700
kWh
|
$8,852
-
kW-mo/yr
|
$28,900
-
MMBtu
|
$10,000
-
Tgal
|
$(-1,700.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs