ITAC Assessment: NL0005
ITAC logo
ITAC Assessment: NL0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product treated municipal and industrial wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 34,170
ft2
Annual Production 1,992,900
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,981 5,591,896
kWh
Electricity Demand $68,484 11,890
kW-mo/yr
Electricity Fees $3,145 -
LPG $13,950 15,000
MMBtu
TOTAL YEARLY COSTS $236,560
RECOMMENDED SAVINGS* $147,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Increase in Production Savings
01 2.4322: Use or replace with energy efficient substitutes $106,860 $650,000 $7,891
289,056
kWh
$6,083
-
kW-mo/yr
$16,236 $76,650
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $35,435 $57,984 $26,020
953,109
kWh
$9,415
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $4,055 $60,000 $3,024
110,769
kWh
$1,031
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $800 $6,424 $800
29,292
kWh
- - -
TOTAL RECOMMENDED $147,150 $774,408 $37,735
1,382,226
kWh
$16,529
-
kW-mo/yr
$16,236 $76,650
TOTAL IMPLEMENTED $800 $6,424 $800
29,292
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs