ITAC Assessment: ND0328
ITAC logo
ITAC Assessment: ND0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Gray Iron Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 87,000
ft2
Annual Production 18,760
ton
Production Hrs. Annual 7,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $535,414 16,765,827
kWh
Electricity Demand $293,214 47,080
kW-mo/yr
Natural Gas $54,246 15,116
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,243 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,994

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 4.222: Purchase re-conditioned material instead of new $12,717 $27,395 $1,465
41,032
kWh
$426
-
kW-mo/yr
- - - - $10,826
02 2.2511: Insulate bare equipment $8,575 $1,100 $6,644
185,815
kWh
$1,931
-
kW-mo/yr
- - - - -
03 4.652: Replace existing equipment with more suitable substitutes $6,212 $7,590 $(-2,484.0)
(-69,461)
kWh
$(-721.0)
-
kW-mo/yr
- - $9,616 $(-199.0) -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $912 $950 $707
19,637
kWh
$205
-
kW-mo/yr
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $892 $200 $892
24,912
kWh
- - - - - -
06 2.3134: Shift from daytime to nighttime operation $748 $250 - $748
-
kW-mo/yr
- - - - -
07 2.2515: Use optimum thickness insulation $489 $1,068 $377
10,551
kWh
$112
-
kW-mo/yr
- - - - -
08 4.611: Begin a practice of predictive / preventative maintenance $285 - - - - - $285 - -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $293 $350 $101
2,931
kWh
$235
-
kW-mo/yr
$(-43.0)
-
MMBtu
- - - -
10 3.5316: Contract a wood pallet recycling company $120 $75 - - - $120
-
lb
- - -
TOTAL RECOMMENDED $31,243 $38,978 $7,702
215,417
kWh
$2,936
-
kW-mo/yr
$(-43.0)
-
MMBtu
$120
-
lb
$9,901 $(-199.0) $10,826
TOTAL IMPLEMENTED $20,994 $36,260 $(-312.0)
(-8,792)
kWh
$658
-
kW-mo/yr
- $120
-
lb
$9,901 $(-199.0) $10,826
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs