ITAC Assessment: ND0324
ITAC logo
ITAC Assessment: ND0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Dry Pet Food
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $100
M
to 500
M
# of Employees 245
Plant Area 3,000,000
ft2
Annual Production 990,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,181,080 31,195,487
kWh
Electricity Demand $593,734 67,592
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,559

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.7111: Reduce illumination to minimum necessary levels $802 $1,525 $423
22,567
kWh
$379
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $1,051 $250 $554
29,601
kWh
$497
-
kW-mo/yr
- - -
03 2.2622: Replace existing chiller with high efficiency model $7,258 $30,000 $4,427
235,346
kWh
$2,831
-
kW-mo/yr
- - -
04 2.4151: Develop a repair/replace policy $52,604 $41,503 $1,240
65,944
kWh
$1,113
-
kW-mo/yr
- $50,251 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $459 $1,800 $476
25,205
kWh
$463
-
kW-mo/yr
$(-480.0) - -
06 4.611: Begin a practice of predictive / preventative maintenance $(-252.0) - - - $(-252.0) - -
07 3.1192: Reduce scrap production $11,250 $7,200 - - $3,750 - $7,500
TOTAL RECOMMENDED $73,172 $82,278 $7,120
378,663
kWh
$5,283
-
kW-mo/yr
$3,018 $50,251 $7,500
TOTAL IMPLEMENTED $19,559 $37,450 $4,981
264,947
kWh
$3,328
-
kW-mo/yr
$3,750 - $7,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs