| Assessment Year | 1999 |
|---|---|
| Principal Product | Milled wheat |
| NAICS |
n/a
|
| SIC | 2041: Flour and Other Grain Mill Products |
| Sales Range | $10 M to 50M |
| # of Employees | 32 |
| Plant Area |
20,022
ft2
|
| Annual Production | 73,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $178,040 | 5,290,446 |
kWh
|
$0.034 |
| Electricity Demand | $116,345 | 12,049 |
kW-mo/yr
|
$9.66 |
| Electricity Fees | $12,301 | - |
|
- |
| Natural Gas | $24,732 | 6,768 |
MMBtu
|
$3.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,903 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $161 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $639 | $1,458 |
$458
13,482
kWh
|
$181
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.2211: Use optimum temperature | $161 | - |
$42
1,172
kWh
|
$119
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,357 | $1,250 |
$584
17,292
kWh
|
$1,043
-
kW-mo/yr
|
$(-270.0)
-
MMBtu
|
- | - | |
| 04 | 4.222: Purchase re-conditioned material instead of new | $2,056 | $38,197 |
$1,449
43,083
kWh
|
$607
-
kW-mo/yr
|
- | - | - | |
| 05 | 4.652: Replace existing equipment with more suitable substitutes | $10,625 | $4,000 | - | - | - | - | $10,625 | |
| 06 | 3.8211: Convert to aqueous cleaning system | $65 | $20 | - | - | - |
$65
-
gal
|
- | |
| TOTAL RECOMMENDED | $14,903 | $44,925 |
$2,533
75,029
kWh
|
$1,950
-
kW-mo/yr
|
$(-270.0)
-
MMBtu
|
$65
-
gal
|
$10,625 | ||
| TOTAL IMPLEMENTED | $161 | - |
$42
1,172
kWh
|
$119
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs