ITAC Assessment: ND0319
ITAC logo
ITAC Assessment: ND0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electromagnetic Coils
NAICS
n/a
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 200,000
ft2
Annual Production 1,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,075 1,620,164
kWh
Electricity Demand $36,850 5,955
kW-mo/yr
Natural Gas $11,385 2,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,121 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $912

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,025 $10,705 $3,894
111,665
kWh
$1,131
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $63 $65 $63
1,758
kWh
- - - -
03 2.7145: Install skylights $535 $420 $99
2,052
kWh
- $436
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $411 $30 $306
8,792
kWh
$105
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $380 $440 $191
5,569
kWh
$47
-
kW-mo/yr
- - $142
06 2.7124: Make a practice of turning off lights when not needed $155 $40 $115
3,224
kWh
$40
-
kW-mo/yr
- - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $283 $510 $149
4,396
kWh
$223
-
kW-mo/yr
$(-89.0)
-
MMBtu
- -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $269 $450 $114
3,224
kWh
$223
-
kW-mo/yr
- $(-68.0)
-
MMBtu
-
TOTAL RECOMMENDED $7,121 $12,660 $4,931
140,680
kWh
$1,769
-
kW-mo/yr
$347
-
MMBtu
$(-68.0)
-
MMBtu
$142
TOTAL IMPLEMENTED $912 $645 $633
18,170
kWh
$368
-
kW-mo/yr
$(-89.0)
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs