ITAC Assessment: ND0229
ITAC logo
ITAC Assessment: ND0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product vacumn formed plastic
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area 130,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 5,600
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,733 2,230,363
kWh
Natural Gas $35,532 7,910
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,253 $1,120 $5,253
68,288
kWh
-
02 2.4133: Use most efficient type of electric motors $4,160 $6,280 $4,160
54,513
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,594 $300 $1,594
20,809
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $567 $358 $567
7,327
kWh
-
05 3.5212: Regrind, reuse, or sell scrap plastic parts $8,900 $15,020 - $8,900
-
lb
TOTAL RECOMMENDED $20,474 $23,078 $11,574
150,937
kWh
$8,900
-
lb
TOTAL IMPLEMENTED $18,880 $22,778 $9,980
130,128
kWh
$8,900
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs